Read a Premium Displacement Report
Scenario: A scenario has executed and the Premium Displacement report is open showing three premium figures - Charged, Current, and Proposed - but it is not clear how to interpret them, or the Charged and Current gap is unexpectedly large.
Goal: Understand what the Premium Displacement report is telling you, determine whether the Charged vs Current gap is a problem that needs investigation, and confirm whether the Proposed premium figures can be relied upon.
Prerequisites
- A scenario with a status of Executed or Partial Executed. Refer to Run a Scenario and Check the Results to know more.
Step 1 - Open the Report
- Locate the scenario in the dashboard or Scenarios view.
- Click Report in the Actions column and select the Premium Displacement report.
Step 2 - Understand the Three Premium States
The report compares premium across three states. Read them in this order:
| Premium State | What It Represents | What to Look For |
|---|---|---|
| Charged Premium | What policyholders are currently paying under their existing policy terms | The baseline - what is actually in the market today |
| Current Premium | What policyholders would pay if re-rated today under the current rate structure, with no changes applied | The re-rated baseline - what the current rates produce |
| Proposed Premium | What policyholders would pay under the rate changes configured in the scenario | The outcome of the rate change |
Step 3 - Interpret the Charged vs Current Gap
The gap between Charged and Current is the most important thing to assess before drawing conclusions from the Proposed figures.
- Compare Charged Premium and Current Premium.
- A small gap is normal - it reflects minor differences between what is being charged and what the current rate structure produces.
- A large gap requires investigation before proceeding.
Common reasons for a large Charged vs Current gap:
| Reason | What It Means |
|---|---|
| The product has not been re-rated recently | The current rate structure has moved away from the rates being charged - this is expected in some cases |
| Rate tables have been updated but policies have not yet renewed | The gap will close over time as policies renew under the new rates |
| A data or configuration issue | The rate tables may not be correctly aligned with the policy data - contact the administrator if this is suspected |
If the gap is large and the reason is not clear, contact the administrator before using the Proposed premium figures. The displacement calculation may be misleading if the Current baseline is not representative of actual market rates.
Step 4 - Interpret the Current vs Proposed Gap
- Compare Current Premium and Proposed Premium.
- This gap is the premium displacement - the net financial effect of the rate change.
- Check whether the displacement is consistent with what the rate change should theoretically produce. A 5% base rate increase should produce approximately 5% premium displacement across the portfolio.
If the displacement looks significantly higher or lower than expected, open the Rate Comparison report to verify the rate adjustments were applied correctly. Refer to Identify Rate Factors Driving a Change to know more.
Step 5 - Check the Distribution of the Change
- Note whether the displacement is evenly distributed or concentrated in specific segments.
- For a detailed segment-level view, open the Segment Analysis report. Refer to Identify Affected Segments to know more.
Step 6 - Export the Report
Click Export within the report and save the file.
The Premium Displacement report is typically the primary output included in actuarial review packages and rate filing submissions. Export it before moving to other reports.
Next Steps
| What You Want to Do | Where to Go |
|---|---|
| Understand which segments are driving the displacement | Identify Affected Segments |
| Verify the rate adjustments were applied correctly | Identify Rate Factors Driving a Change |
| Understand the policyholder-level impact | Open the Winner / Loser report from the same scenario |
| Compare this result against an alternative proposal | Compare Two Rate Change Proposals |
Having trouble? Refer to our FAQs or Troubleshooting guide to know more.